SAFETY

SAFETY PROGRAM

General reules 

Hazard control program

Excavation / street construction

Scaffolding

Temporary electrical installatin

Tools

Gas hazards

Mobile cranes  , guy derricks , tower cranes

Silings

Safety precautions for crane operators

SAFETY PRACTICE RULES

Crane operators

Carpenters and wood workers

Cement handlers and concrete workers

Electrical workers

Instalation workers

Steel workers and riggers

Labores

Equipment operators

Painters

Pipe workers

Welders

Sheet metal workers

Truck drivers

Warehouse men

Watchmen

FIRE PREVNTION

Housekeeping

Fire protection

Fire hazards

Fire prevention in welding / cutting

HIGH VOLTAGE WORK SAFETY RULESH

Genersl safety precautions

Access

Switching

Earthing

Electrical permits to work

Work in substation and switching

Remotely and automatically control and equipment

Work on hagh voltage apparatus other than overhead lines

Work on metal-cald switchgear spouts

Work on high voltage and conductors

Testing high voltage apparatus

Prepartion for work on high voltage apparatus

Containing or opearted  by compressed air

Work in vicinity of equipment containing sulfur hexaflouride (sf6 ) gas

Safety rules for work on medium and high voltage apparatus ,  conductors and equipement

Work on relay , control . and other auxiliary equipment

Defentions

error: Content is protected !! ASMEE